Project information
- Category: EMS Project
- Region & Country: China, Asia Pacific
- Client: Industry
- Project Configuration: 125kW/261kWh BESS +EMS+75kWp solar system
- Project Time: 2026
- Applied Solution: Commercial and Industrial
- Applied EMS: EMS Controller Set
- Applied BESS: EGS215 Cabinet
- Applied Service: Engineering
- Applied Logics: Load Shifting, Peak Shaving, Backflow Control, Overload Prevention