CASES

Project information

  • Category: EMS Project
  • Region & Country: China, Asia Pacific
  • Client: Industry
  • Project Configuration: 125kW/261kWh BESS +EMS+75kWp solar system
  • Project Time: 2026
  • Applied Solution: Commercial and Industrial
  • Applied EMS: EMS Controller Set
  • Applied BESS: EGS215 Cabinet
  • Applied Service: Engineering
  • Applied Logics: Load Shifting, Peak Shaving, Backflow Control, Overload Prevention