CASES

Project information

  • Category: EMS Project
  • Region & Country: China, Asia Pacific
  • Client: BESS Factory
  • Project Configuration: 200kW/430kWh BESS + EMS + Diesel Generator
  • Project Time: 2025
  • Applied Solution: Commercial and Industrial
  • Applied EMS: Power & Control DB
  • Applied BESS: EGS215 Cabinet
  • Applied Service: Engineering, Consultancy
  • Applied Logics: Peak Shaving (save extra solar energy into the BESS), Load Shifting, Black Start, Seamless Switching, Frequency regulation