CASES

Project information

  • Category: Microgrid Project
  • Region & Country: Switzerland, Europe
  • Client: Manufacturer
  • Project Configuration: 500kW/1028.89kWh BESS+EMS+UPS+ECC8P+450kWp Solar System+600kW EV Charger
  • Project Time: 2026
  • Applied Solution: Commercial & Industrial Solutions
  • Applied EMS: EMS Controller Set
  • Applied BESS: EGS257
  • Applied Service: Engineering
  • Applied Logics: Peak Shaving,Self-consumption Optimization,Grid Power Exchange Control,Load Shifting,Black Start