Project information
- Category: Microgrid Project
- Region & Country: Switzerland, Europe
- Client: Integrator
- Project Configuration: 1000kW/2057.83kWh BESS+EMS+ECC8P+400kWpSolar System+EV Charger
- Project Time: 2025
- Applied Solution: Residential Community Solutions
- Applied EMS: EMS Controller Set
- Applied BESS: EGS257
- Applied Service: Engineering
- Applied Logics: Peak Shaving, Grid Power Exchange Control, Load Shifting, Black Start