CASES

Project information

  • Category: Microgrid Project
  • Region & Country: UK, Europe
  • Client: Industry
  • Project Configuration: 500kW/1028.89kWh+BESS+EMS+ECC4P+Power Grid Detection Cabinet+300kWp Solar System
  • Project Time: 2026
  • Applied Solution: Commercial and Industrial Solutions
  • Applied EMS: EMS Controller Set
  • Applied BESS: EGS257
  • Applied Service: Engineering
  • Applied Logics: Peak Shaving, Load Shifting, Grid Power Exchange Control, Seamless Switching