CASES

Project information

  • Category: Microgrid Project
  • Region & Country: Vietnam, Asia
  • Client: Energy Storage EPC Integrator
  • Project Configuration: 125kW/257kWh BESS+ EMS + 6.4MWp Solar System+ Black Start
  • Project Time: 2026
  • Applied Solution: EV Charging Station Solutions
  • Applied EMS: EMS Controller Set
  • Applied BESS: EGS257 Cabinet
  • Applied Service: Engineering
  • Applied Logics: Load Shifting, Peak Shaving, Backflow Control, Overload Prevention, Arbitrate