CASES

Project information

  • Category: BESS Project
  • Region & Country: Switzerland, Europe
  • Client: BESS&PV Installer
  • Project Configuration: 1100kW/2298.98kWh BESS + EMS
  • Project Time: 2025
  • Applied Solution: Residential Community Solutions
  • Applied EMS: EMS Controller Set
  • Applied BESS: EGS120 and EGS257
  • Applied Service: Engineering
  • Applied Logics: Peak Shaving, Self-consumption Optimization