Project information
- Category: Microgrid Project
- Region & Country: Indonesia, Asia Pacific
- Client: Island Grid Company
- Project Configuration: 3000kW/6450kWh BESS + EMS + Existing Solar System
- Project Time: 2024-2025
- Applied Solution: Remote Area Solution
- Applied EMS: EMS Controller Set
- Applied BESS : ES1075 Container
- Applied Service : Engineering, Consultancy
- Applied Logics: Peak Shaving (save extra solar energy into the BESS), Load Shifting and Switching between Grid and BESS