CASES

Project information

  • Category: Microgrid Project
  • Region & Country: China, Asia Pacific
  • Client: Manufacturing Factory
  • Project Configuration: 100kW/215.04kWh BESS + EMS + Existing Solar System
  • Project Time: 2024
  • Applied Solution: Commercial and Industrial
  • Applied EMS: EMS Controller Set
  • Applied BESS : EGS215 Cabinet
  • Applied Service : Engineering, Consultancy
  • Applied Logics: Peak Shaving (save extra solar energy into the BESS) and Load Shifting