CASES

Project information

  • Category: Microgrid Project
  • Region & Country: China, Asia Pacific
  • Client: National Grid Company
  • Project Configuration: 30kW/60kWh BESS + EMS + Solar System + Wind Turbine
  • Project Time: 2023
  • Applied Solution: Commercial and Industrial
  • Applied EMS: EMS Controller Set
  • Applied BESS : N/A
  • Applied Service : Engineering, Consultancy
  • Applied Logics: Peak Shaving (save extra solar energy into the BESS) and Load Shifting