CASES

Project information

  • Category: Microgrid Project
  • Region & Country: Switzerland, Europe
  • Client: Vegetable Processing Factory
  • Project Configuration: 200kW/465.92kWh BESS + EMS + Existing Solar System
  • Project Time: 2024
  • Applied Solution: Commercial and Industrial
  • Applied EMS: EMS Controller Set
  • Applied BESS : EGS215 Cabinet
  • Applied Service : Engineering, Consultancy
  • Applied Logics: Peak Shaving (no more than **kW power from grid to prevent high electricity rate and save extra solar energy into the BESS) and Load Shifting