Project information
- Category: Microgrid Project
- Region & Country: China, Asia Pacific
- Client: National Grid Company
- Project Configuration: 50kW/100kWh BESS + EMS + 460kW Solar System + 50kW Wind Turbine + 60kW EV Charger
- Project Time: 2023
- Applied Solution: Commercial and Industrial
- Applied EMS: EMS Controller Set
- Applied BESS : EGS120 Cabinet
- Applied Service : Engineering, Consultancy
- Applied Logics: Peak Shaving (save extra solar energy into the BESS) and Load Shifting