CASES

Project information

  • Category: Microgrid Project
  • Region & Country: China, Asia Pacific
  • Client: National Grid Company
  • Project Configuration: 50kW/100kWh BESS + EMS + 460kW Solar System + 50kW Wind Turbine + 60kW EV Charger
  • Project Time: 2023
  • Applied Solution: Commercial and Industrial
  • Applied EMS: EMS Controller Set
  • Applied BESS : EGS120 Cabinet
  • Applied Service : Engineering, Consultancy
  • Applied Logics: Peak Shaving (save extra solar energy into the BESS) and Load Shifting