CASES

Project information

  • Category: Microgrid Project
  • Region & Country: Myanmar, Asia Pacific
  • Client: Construction Company
  • Project Configuration: 100kW/215.04kWh BESS + EMS + Existing Solar System + Existing Diesel Generator
  • Project Time: 2025
  • Applied Solution: Commercial and Industrial
  • Applied EMS: EMS Controller Set
  • Applied BESS : EGS215 Cabinet
  • Applied Service : Engineering, Consultancy
  • Applied Logics: Peak Shaving (save extra solar energy into the BESS), Load Shifting and Switching between Grid and BESS/DG