Project information
- Category: Microgrid Project
- Region & Country: Myanmar, Asia Pacific
- Client: Construction Company
- Project Configuration: 100kW/215.04kWh BESS + EMS + Existing Solar System + Existing Diesel Generator
- Project Time: 2025
- Applied Solution: Commercial and Industrial
- Applied EMS: EMS Controller Set
- Applied BESS : EGS215 Cabinet
- Applied Service : Engineering, Consultancy
- Applied Logics: Peak Shaving (save extra solar energy into the BESS), Load Shifting and Switching between Grid and BESS/DG