Project information
- Category: Microgrid Project
- Region & Country: Netherlands, Europe
- Client: Farmer
- Project Configuration: 500kW/1036.8kWh BESS + EMS + Existing Solar System
- Project Time: 2024-2025
- Applied Solution: Commercial and Industrial
- Applied EMS: EMS Controller Set
- Applied BESS : EGS120 Cabinet
- Applied Service : Engineering, Consultancy
- Applied Logics: Abitrage with grid and Peak Shaving (save extra solar energy into the BESS)