CASES

Project information

  • Category: Microgrid Project
  • Region & Country: Netherlands, Europe
  • Client: Farmer
  • Project Configuration: 500kW/1036.8kWh BESS + EMS + Existing Solar System
  • Project Time: 2024-2025
  • Applied Solution: Commercial and Industrial
  • Applied EMS: EMS Controller Set
  • Applied BESS : EGS120 Cabinet
  • Applied Service : Engineering, Consultancy
  • Applied Logics: Abitrage with grid and Peak Shaving (save extra solar energy into the BESS)