Project information
- Category: Microgrid Project
- Region & Country: Myanmar, Asia Pacific
- Client: Construction Company
- Project Configuration: 50kW/103.68kWh BESS + EMS + Existing Solar System
- Project Time: 2025
- Applied Solution: Commercial and Industrial
- Applied EMS: EMS Controller Set
- Applied BESS : egs120 Cabinet
- Applied Service : Engineering, Consultancy
- Applied Logics: Peak Shaving (save extra solar energy into the BESS) and Load Shifting