Project information
- Category: Microgrid Project
- Region & Country: Poland, Europe
- Client: Manufacturing Factory
- Project Configuration: 100kW/215.04kWh BESS + EMS + Existing Solar System
- Project Time: 2024-2025
- Applied Solution: Commercial and Industrial
- Applied EMS: EMS Controller Set
- Applied BESS : EGS215 Cabinet
- Applied Service : Engineering, Consultancy
- Applied Logics: Peak Shaving (save extra solar energy into the BESS) and Load Shifting