CASES

Project information

  • Category: BESS Project
  • Region & Country: Russia, Europe
  • Client: Factory
  • Project Configuration: 375kW/771.69kWh BESS + EMS + Real 0 Sec. Seamless Switching + Power Grid Detection Equipment + ECC2P
  • Project Time: 2026
  • Applied Solution: Residential Community Solutions
  • Applied EMS: EMS Controller Set
  • Applied BESS: EGS257
  • Applied Service: Engineering
  • Applied Logics: Peak Shaving,Load Shifting, Backflow prevention, 0-sec Seamless Switching