Project information

  • Category: EMS Project
  • Region & Country: China, Asia Pacific
  • Client: BESS Factory
  • Project Configuration: Exsiting BESS + EMS + Existing Solar System + Diesel Generator
  • Project Time: 2025
  • Applied Solution: Commercial and Industrial
  • Applied EMS: EMS Cabinet
  • Applied BESS: N/A
  • Applied Service: Engineering , Consultancy
  • Applied Logics: Peak Shaving (save extra solar energy into the BESS), Load Shifting, Black Start