CASES

Project information

  • Category: Microgrid Project
  • Region & Country: Czech Republic, Europe
  • Client: Solar Power Plant Developer
  • Project Configuration: 1600kW/3440.64kWh BESS + EMS + Existing Solar System
  • Project Time: 2024
  • Applied Solution: Power Station Solutions
  • Applied EMS: Power & Control DB
  • Applied BESS : EGS215 Cabinet and ES2150 Container
  • Applied Service : Engineering, Consultancy
  • Applied Logics: Abitrage with grid and Peak Shaving (save solar energy into the BESS when the rate is low or negative)